Quality Timber Supplies
SPEAK TO US TODAY Lines Open Until 5PM
Bristol: 0117 370 7890

Provisions of a Base

Buildings should be erected on level prepared sites.   If your building is to be positioned close to a hedge, fence or other building please allow for the roof overhang which is bigger than the footprint size of the building. 

The floor runners do not always run in the same direction on all sheds.   You should ask for a floor plan which will illustrate the position of the floor runners and frame

We recommend any of the following:-


The use of a tanalised (pressure treated) frame sits underneath the building allows air to circulate under the floor helping to prevent the ingress of moisture.   Frames are vital to ensure a long-lasting building.

Preparation of a level base is the customers’ responsibility, unless prior arrangement has been made.   Shed Scene can undertake to provide a suitable level base.   Our labour charge is £25.00 per hour, per man, plus the cost of materials used.

We are able to make visits to your property  in order to estimate for the provision of a base.   NOTE - base examples shown are specific to certain sizes of shed.

We can also quote you on the dismantle and removal of an existing building. 




Brochure request form

Please enter your details below and we will send you a copy of our latest brochure.